Frame Frog

Frame Frog

Save cost and time on door opening pathways.

  • Home
  • What is Frame Frog?
    • For Audiences
      • For Architects
      • For Developers
      • For Property Owners
      • For General Contractors
      • For Installers
    • Other Links
      • About Us
    • Menu CTA Widgets 1
  • Our Products
    • Frame Frog Products
      • All Products
      • Frame Frog Long
      • Frame Frog Short
      • Frame Frog Kits
    • Menu CTA Widgets 2
  • Resources
    • Product Resources
      • All Resources
      • Downloads
      • FAQs
      • Case Studies
      • Blog
      • Videos
    • Menu CTA Widgets 3
  • Contact Us
  • Request a Demo

Blog

Frame Frog Blog Posts

Stay informed with the latest news, industry insights, and tips from Frame Frog’s blog.

  • Facility Managers Deserve Better: The Serviceability Problem

    Facility Managers Deserve Better: The Serviceability Problem

    Facility managers spend too much time fighting openings that weren’t built to be serviced. When wiring pathways are improvised during…

    Read More

  • How Smart Wiring Decisions Impact Property Value

    How Smart Wiring Decisions Impact Property Value

    Wiring pathways are invisible, but their impact on property value is not. Learn how Frame Frog gives owners a future-ready…

    Read More

  • Why Work Harder When You Can Work Smarter?

    Why Work Harder When You Can Work Smarter?

    For years, the industry has accepted wiring improvisation as normal. Frame Frog changes that with a smarter, standardized pathway that…

    Read More

  • Why Wiring Pathways Should Be Standardized at Bid Time

    Why Wiring Pathways Should Be Standardized at Bid Time

    Access control openings run smoother when wiring pathways are standardized before the bid. Here’s why defining that scope early saves…

    Read More

  • How Frame Frog Helps GCs Avoid Change Orders

    How Frame Frog Helps GCs Avoid Change Orders

    Change orders drain profit and delay schedules. Frame Frog closes the gap by providing a clear, UL fire-rated wiring pathway…

    Read More

  • Why Electricians and Integrators Need the Same Roadmap

    Why Electricians and Integrators Need the Same Roadmap

    A shared wiring roadmap keeps electricians and integrators aligned, preventing rework, failed inspections, and installation headaches. Frame Frog provides the…

    Read More

1 2 3 … 5
Next Page

Press Inquiries?

Contact us

What is Frame Frog?

  • About Us

Our Products

  • All Products
  • Frame Frog Long
  • Frame Frog Short
  • Frame Frog Kits

Resources

  • All Resources
  • Downloads
  • FAQs
  • Case Studies
  • Blog
  • Videos

Contact Us

  • Contact Us
312 Plum St, Suite 710,
Cincinnati, OH 45202
info@framefrog.us
(513) 702-5436
  • Email
  • Facebook
  • LinkedIn
  • Phone
  • YouTube

©2025 Frame Frog. All Rights Reserved.