Frame Frog

Frame Frog

Save cost and time on door opening pathways.

  • Home
  • What is Frame Frog?
    • For Audiences
      • For Architects
      • For Developers
      • For Property Owners
      • For General Contractors
      • For Installers
    • Other Links
      • About Us
  • Our Products
    • Frame Frog Products
      • All Products
      • Frame Frog LONG
      • Frame Frog SHORT
      • Frame Frog Kits
  • Resources
    • How to Specify Frame Frog
    • Product Resources
      • All Resources
      • Downloads
      • FAQs
      • Case Studies
      • Blog
      • Videos
  • Contact Us
  • Purchase

Home

Save Significant Time and Money on Your Next Construction Project

Request a Demo
Our Products
Patent Stamp
UL Logo
USA Made

July 4th Special
Contact us to Learn More
@joeydoesathing You would think Frame Frog would be an industry standard product with how much everyone complains about access controlled doors #accesscontrols #doorhardware #lowvoltage #constructionlife #generalcontractor ♬ original sound – Joey
@joeydoesathing Door Hardware!!!! #generalcontractor #constructionlife #trades #projectmanagement #makeconstructionfunagain ♬ original sound – Joey

What is Frame Frog?

Frame Frog simplifies the complexities of access control installation by creating a clear, reliable pathway through any door frame. With its intuitive design and versatile configurations, Frame Frog drastically cuts down on labor time, supports future hardware needs, and eliminates costly project delays and rework. 

Frame Frog: The Smarter Solution for Modern Construction Challenges

Frame Frog offers a groundbreaking approach to wiring installation in construction projects, simplifying processes and enhancing efficiency while protecting your budget and future-proofing buildings.

Read Post
Frame Frog Artwork

Our Products

Frame Frog LONG

The versatile FRG-4L can be used in any frame location but is the product of choice for electric power transfers (EPT) up to 9” long. 

View Specs

Frame Frog SHORT

Our new smaller Frame Frog model, FRG-4S, is designed for all hardware preps in a door frame
up to 5” long. 

View Specs

Frame Frog Kits

Frame Frog Prep Kits contain all the parts necessary to assemble a complete pathway within a frame and can be purchased in one package for shop or field installation 

View Specs

Leap Over Wiring Obstacles

Contact Us
Request a Demo

What Can Frame Frog Do For You?

Frame Frog is designed to streamline access control wiring across all stages of a project, saving time, reducing costs,
and ensuring adaptable security pathways.

Architect

Ensure each design is future-ready with adaptable wiring pathways, simplifying specs and reducing change orders. 

Learn More

Developer

Avoid costly modifications and build properties ready for long-term access control demands. 

Learn More

Property Owner

Invest in properties that stay relevant with easy, affordable upgrades as security needs evolve. 

Learn More

General Contractor

Streamline the installation process, avoid delays, and deliver on time with Frame Frog’s
easy-to-use pathways. 

Learn More

Support Your Project From Start to Finish

Explore our installer guides, cut sheets, and support to keep
your project on track. 

Resources

Why Customers Love Frame Frog

 ”Previously, I have spent hours on a single door where there was no pre-design or the box method was used.
FrameFrog is a real time saver.”

Trevor Ritter
Trevor Ritter
Field Operations Manager

“FrameFrog was the best new product at the entire
2023 BICSI Winter Show.”

F. Patrick Mahoney
F. Patrick Mahoney
Architectural Consultant 
Linkedin Logo

It’s a brilliant solution that every wired-up opening should have installed. Saving the integrator, installer, and manufacturer from costly change orders. finger pointing during a job. (https://www.linkedin.com/in/benjibolickthedoordork/)

Benji Bolick
Benji Bolick
(a.k.a The Door Dork)

“One of the most innovative products for hollow metal doors and frames and security integration – One of those, Wow, how did we live without it items.”

Kevin Michael Donaghy
Kevin Michael Donaghy, AHC, CFDAI, CSI, CRL
Commercial Hardware & Access Control Security Consultant 

“We feel that Frame Frog today is giving us the best of both worlds. It’s streamlining our installation. It’s making things a lot easier for the crew. The other thing it’s doing is its future-proofing tomorrow – whatever new technologies may be forthcoming.” 

Dave Edwards
Dave Edwards, AHC, CSI, CDT
Architectural Consultant 
Distributor

Just wanted to say thank you again. You really came through for us in a crunch and it is much appreciated! We have received the frame frogs and have also forwarded your product on a mass email to all our PM’s for future use! You are incredibly helpful, and I just wanted to make sure that I extend my gratitude.

Paul Soldinie
Paul Soldinie
Project Manager

How to Specify Frame Frog

Read this guide to save time across the whole project by specifying Frame Frog correctly.

Read now
Specification
News

What We’re Croaking About

Disagreement

Access Control Wiring Coordination: How Frame Frog Ends the Trade Scope War

When hollow metal fabricators, electrical contractors, and technology contractors share the same few inches of door frame with no defined scope boundary, the result is delays, change orders, and padded bids — and Frame Frog ends the dispute by giving each trade a clean, defined handoff.

Read More Access Control Wiring Coordination: How Frame Frog Ends the Trade Scope War

Fire Door

Access Control on Fire-Rated Openings: What You Can and Cannot Do

A fire-rated opening does not give you room to improvise, which is exactly where access control wiring tends to run into hard compliance rules.

Read More Access Control on Fire-Rated Openings: What You Can and Cannot Do

construction-team

The Dysfunction at the Door Opening Everyone Has Learned to Ignore

The access controlled opening has quietly become one of the most dysfunctional parts of commercial construction, and almost no one notices anymore. Here is what paying attention actually reveals.

Read More The Dysfunction at the Door Opening Everyone Has Learned to Ignore

playbook

The New Playbook for Access Control Wire Management

For over 120 years, access control wiring has been a sandlot game with no rulebook. Frame Frog is writing the new playbook, one clean route through the frame at a time.

Read More The New Playbook for Access Control Wire Management

Contact Us

Ready to Take the Leap?

Contact us for a live demo or a quote.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*
Newsletter Signup

What is Frame Frog?

  • About Us

Our Products

  • All Products
  • Frame Frog LONG
  • Frame Frog SHORT
  • Frame Frog Kits

Resources

  • All Resources
  • Downloads
  • FAQs
  • Case Studies
  • Blog
  • Videos

Contact Us

  • Contact Us
6317 Emberwood Ctr,
West Chester, OH 45069
info@framefrog.us
(513) 702-5436
  • Email
  • Facebook
  • LinkedIn
  • Phone
  • YouTube

©2026 Frame Frog. All Rights Reserved.