Electrified openings aren’t just about the lock. From badge readers to ADA actuators, every extra device needs a wiring plan. Frame Frog provides the infrastructure to handle today’s needs and tomorrow’s upgrades.
UL Fire Ratings and Frame Frog
Fire ratings are essential but they’re often compromised by late-stage wiring decisions. Frame Frog offers a UL-listed solution that keeps your frame compliant and your install on schedule.
Manual Railroad Track Switch
Pathway decisions may seem small during design but they shape everything that follows. This post explains why Frame Frog gives teams the clarity and structure field improvisation can’t.
A look at all pathway options side by side
Not all frame wiring methods are created equal. Learn the long-term impact of doing nothing, using standard conduit, or choosing a purpose-built system like Frame Frog.
Frame Frog Detailed
Frame Frog is changing the way professionals handle wiring in door openings. This blog dives into its design, installation methods, and how it eliminates last-minute workarounds and costly retrofits.