Frame Frog

Frame Frog

Save cost and time on door opening pathways.

  • Home
  • What is Frame Frog?
    • For Audiences
      • For Architects
      • For Developers
      • For Property Owners
      • For General Contractors
      • For Installers
    • Other Links
      • About Us
  • Our Products
    • Frame Frog Products
      • All Products
      • Frame Frog LONG
      • Frame Frog SHORT
      • Frame Frog Kits
  • Resources
    • How to Specify Frame Frog
    • Product Resources
      • All Resources
      • Downloads
      • FAQs
      • Case Studies
      • Blog
      • Videos
  • Contact Us
  • Request a Demo
Architect

What Architects Can Do to Improve Access Control Designs

Ron Hicks
Jul 24, 2026

Between the drawing and the finished opening is a gap most architects never see, where a fully specified access control device meets a frame that was never prepared to receive its wiring.

Architects, Developers

All Posts

Door Use Case

Solutions Made Possible by Frame Frog

Ron Hicks
Sep 4, 2025

Electrified openings aren’t just about the lock. From badge readers to ADA actuators, every extra device needs a wiring plan. Frame Frog provides the infrastructure to handle today’s needs and tomorrow’s upgrades.

Architects, Construction, Developers, Solution

All Posts

UL Facility

UL Fire Ratings and Frame Frog

Ron Hicks
Jul 24, 2025

Fire ratings are essential but they’re often compromised by late-stage wiring decisions. Frame Frog offers a UL-listed solution that keeps your frame compliant and your install on schedule.

Architects, Construction, FrameFrog, Solution

All Posts

Cost Management

How Frame Frog Helps Owners Defer Costs

Ron Hicks
Jul 10, 2025

Tight budgets don’t have to mean cutting access control entirely. This blog explains how Frame Frog helps building owners install wiring infrastructure now and expand security later.

Architects, Developers

All Posts

Cover

What Makes Wiring Electrified Openings So Hard? A Conversation That Hits Home

Ron Hicks
May 15, 2025

Wiring access-controlled openings doesn’t have to be chaotic. In a recent interview on Let’s Talk Cabling, the creators of Frame Frog break down why planning pathways early saves time, cost, and coordination headaches.

Architects

All Posts

  • 1
  • 2
  • Next Page »

What is Frame Frog?

  • About Us

Our Products

  • All Products
  • Frame Frog LONG
  • Frame Frog SHORT
  • Frame Frog Kits

Resources

  • All Resources
  • Downloads
  • FAQs
  • Case Studies
  • Blog
  • Videos

Contact Us

  • Contact Us
6317 Emberwood Ctr,
West Chester, OH 45069
info@framefrog.us
(513) 702-5436
  • Email
  • Facebook
  • LinkedIn
  • Phone
  • YouTube

©2026 Frame Frog. All Rights Reserved.