Frame Frog Blog Posts
Stay informed with the latest news, industry insights, and tips from Frame Frog’s blog.
-
How Frame Frog Helps GCs Avoid Change Orders
Change orders drain profit and delay schedules. Frame Frog closes the gap by providing a clear, UL fire-rated wiring pathway…
-
Why Electricians and Integrators Need the Same Roadmap
A shared wiring roadmap keeps electricians and integrators aligned, preventing rework, failed inspections, and installation headaches. Frame Frog provides the…
-
Solutions Made Possible by Frame Frog
Electrified openings aren’t just about the lock. From badge readers to ADA actuators, every extra device needs a wiring plan.…
-
Why is there no pathway standard?
Wiring pathways in access control have no universal standard, creating delays, rework, and inspection failures. Frame Frog provides a consistent,…
-
How electricians should rough-in conduit in concrete block wall
In CMU construction, there’s no room for conduit mistakes. This guide walks electricians through how to rough-in conduit properly to…
-
UL Fire Ratings and Frame Frog
Fire ratings are essential but they’re often compromised by late-stage wiring decisions. Frame Frog offers a UL-listed solution that keeps…