Frame Frog

Frame Frog

Save cost and time on door opening pathways.

  • Home
  • What is Frame Frog?
    • For Audiences
      • For Architects
      • For Developers
      • For Property Owners
      • For General Contractors
      • For Installers
    • Other Links
      • About Us
    • Frame Frog is a pioneering solution that revolutionizes the wiring of hollow metal door frames for electrified door hardware. Its innovative design offers flexibility, efficiency, and future-proofing for both single and double door configurations.

  • Our Products
    • Frame Frog Products
      • All Products
      • Frame Frog Long
      • Frame Frog Short
      • Frame Frog Kits
    • Discover the innovative Frame Frog lineup, designed to revolutionize the wiring of hollow metal door frames for electrified hardware.

  • Resources
    • Product Resources
      • All Resources
      • Downloads
      • FAQs
      • Case Studies
      • Blog
      • Videos
    • Stay informed and confident with installation guides, FAQs, insights, and more designed to support your success.

  • Contact Us
  • Request a Demo
Door Use Case

Solutions Made Possible by Frame Frog

Ron Hicks
Sep 4, 2025

Electrified openings aren’t just about the lock. From badge readers to ADA actuators, every extra device needs a wiring plan. Frame Frog provides the infrastructure to handle today’s needs and tomorrow’s upgrades.

Architects, Construction, Developers, Solution

All Posts

Installer

Why is there no pathway standard?

Ron Hicks
Aug 21, 2025

Wiring pathways in access control have no universal standard, creating delays, rework, and inspection failures. Frame Frog provides a consistent, code-compliant solution.

Construction, General

All Posts

Cutting a massionary wall

How electricians should rough-in conduit in concrete block wall

Ron Hicks
Aug 7, 2025

In CMU construction, there’s no room for conduit mistakes. This guide walks electricians through how to rough-in conduit properly to support access-controlled openings.

Construction, Developers

All Posts

UL Facility

UL Fire Ratings and Frame Frog

Ron Hicks
Jul 24, 2025

Fire ratings are essential but they’re often compromised by late-stage wiring decisions. Frame Frog offers a UL-listed solution that keeps your frame compliant and your install on schedule.

Architects, Construction, FrameFrog, Solution

All Posts

Cost Management

How Frame Frog Helps Owners Defer Costs

Ron Hicks
Jul 10, 2025

Tight budgets don’t have to mean cutting access control entirely. This blog explains how Frame Frog helps building owners install wiring infrastructure now and expand security later.

Architects, Developers

All Posts

  • 1
  • 2
  • Next Page »

What is Frame Frog?

  • About Us

Our Products

  • All Products
  • Frame Frog Long
  • Frame Frog Short
  • Frame Frog Kits

Resources

  • All Resources
  • Downloads
  • FAQs
  • Case Studies
  • Blog
  • Videos

Contact Us

  • Contact Us
312 Plum St, Suite 710,
Cincinnati, OH 45202
info@framefrog.us
(513) 702-5436
  • Email
  • Facebook
  • LinkedIn
  • Phone
  • YouTube

©2025 Frame Frog. All Rights Reserved.