Electrified openings aren’t just about the lock. From badge readers to ADA actuators, every extra device needs a wiring plan. Frame Frog provides the infrastructure to handle today’s needs and tomorrow’s upgrades.
Why is there no pathway standard?
Wiring pathways in access control have no universal standard, creating delays, rework, and inspection failures. Frame Frog provides a consistent, code-compliant solution.
How electricians should rough-in conduit in concrete block wall
In CMU construction, there’s no room for conduit mistakes. This guide walks electricians through how to rough-in conduit properly to support access-controlled openings.
UL Fire Ratings and Frame Frog
Fire ratings are essential but they’re often compromised by late-stage wiring decisions. Frame Frog offers a UL-listed solution that keeps your frame compliant and your install on schedule.
How Frame Frog Helps Owners Defer Costs
Tight budgets don’t have to mean cutting access control entirely. This blog explains how Frame Frog helps building owners install wiring infrastructure now and expand security later.