Frame Frog Blog Posts
Stay informed with the latest news, industry insights, and tips from Frame Frog’s blog.
-

Why Work Harder When You Can Work Smarter?
For years, the industry has accepted wiring improvisation as normal. Frame Frog changes that with a smarter, standardized pathway that…
-

Why Wiring Pathways Should Be Standardized at Bid Time
Access control openings run smoother when wiring pathways are standardized before the bid. Here’s why defining that scope early saves…
-

How Frame Frog Helps GCs Avoid Change Orders
Change orders drain profit and delay schedules. Frame Frog closes the gap by providing a clear, UL fire-rated wiring pathway…
-

Why Electricians and Integrators Need the Same Roadmap
A shared wiring roadmap keeps electricians and integrators aligned, preventing rework, failed inspections, and installation headaches. Frame Frog provides the…
-

Solutions Made Possible by Frame Frog
Electrified openings aren’t just about the lock. From badge readers to ADA actuators, every extra device needs a wiring plan.…
-

Why is there no pathway standard?
Wiring pathways in access control have no universal standard, creating delays, rework, and inspection failures. Frame Frog provides a consistent,…
